
Engineering
Geology
Hydrology
Expert Witness

Site Assessments
Planning & Management
Remediation

Client List
CEC Staff

|
REMEDIATION
CEC personnel have performed assessments, remedial investigations and feasibility studies (RI/FS) at both operating and inactive
hazardous waste sites across the United States. Corrective action programs are prepared in accordance with local, state and federal regulatory requirements.
The diversity of our professional disciplines allows us to address the various elements of complicated RI/FS investigations.
The process of performing assessments, remedial investigations and feasibility studies provides the data and methodology necessary for selecting the most
cot-effective cleanup design for sites contaminated with hazardous materials and waste. Examples of our applied expertise are:
- Completion of an RI/FS at a multi-PRP Superfund site for a major electronics/microchip company;
included the use of surface geophysics, in-situ soil gas analyses, a drilling program, groundwater
sampling and site diagram analyses.
- Preparation of feasibility studies that included pilot testing remedial alternatives, including
standard and innovative alternatives, such as ultraviolet radiation and bioremediation.
- CEC personnel designed, installed, and managed the operation of the first successful
demonstration of an innovative multi-phase remedial technology at a site in Southern California.
- Reviewed existing plans and designed alternatives for an effective groundwater barrier to protect
a small community from a Superfund site.
[Services] [Projects]
[About CEC] [Contact CEC]
For additional information,
call 573-332-1114
www.CloseEnvironmental.com
Copyright © 1998, 1999, 2000, 2001, 2002, All rights reserved,
Close Environmental Consultants
A Division of Anodyne, Inc.
Design and layout services provided by Close Environmental
This site is hosted by Affordable Web pages
Updated: 16 July 06
|
|
|